INDUSTRIAL ENGINEER
Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.
PROFESSIONAL EXPERIENCE
1985-Present LEYNER CORPORATION,Lake Charles,LA
Industrial Engineer
Provide floor support engineering in printed wire assembly (PWA) and subsystem assembly (SSA) areas.
Purchase capital rface with vendors. Justify expenditures.
Design plant layout fixtures,and flow charts of material.
Program automatic equipment.
Write process sheets and rework procedures.
Recommend changes to product to allow ease of manufacture.
Implement design itate methods and process improvements.
Troubleshoot ct disposition or rejection of material.
Provide assistance to all other departments.
1984 PRUDENCE D. MCHARRISON LABORATORY,Ruston,LA
Engineering Assistant(責任編輯:雨天)