Company's name: | Dongguan Shili Woolen CO.,LTDBegin and end date: 2003-03-2008-12 |
Enterprise nature: | Private enterprisesIndustry: Trade/Consumption/Manufacturing/Operation |
Job Title: | Manager |
Job description: | which is a Big manufactory of Hong Kong investment,and the main charge was informational Management and implement, the point of which was PDM/E-R And UML Of ERP and Network planning and Programming and security,as well as different work plans in the department(Planing,Communication and Technic、Optimize Organise、Staff responsibility) in the company,I am familiar with ERP Software Process (Research,Requirement、Flow Design、Code、Test and Actualize),especial example:BOM,MRP、Stock Control、Cost and all that,the software program and system are base on B/S structure,I went to the head company in Hong Kong for many times to talk about EPR; |
Reasons for leaving: | |
|
Company's name: | Desheng,Electric Toy CO.,LTDBegin and end date: 2000-03-2003-03 |
Enterprise nature: | Private enterprisesIndustry: Trade/Consumption/Manufacturing/Operation |
Job Title: | Administrator |
Job description: | the main job Were the second application of EPR actualize,the main module include manufacture BOM;sale(SOC);Provide(SCM);MPS;work(WOC);materiel(MRC);IQC;storage(STK);SHIP;CRM;COST and so on,I am familiar with toy’s characteristic(many materiel,complex BOM,complex Process) and nine systems of Manufacturing abount ERP,also ERP-U8(UFIDA) system; |
Reasons for leaving: | |
|
Company's name: | Dongtou Woolen CO.,LTDBegin and end date: 1997-09-2000-02 |
Enterprise nature: | Private enterprisesIndustry: Trade/Consumption/Manufacturing/Operation |
Job Title: | soft engineer |
Job description: | main took charge of the Exploitation and implement of MRPⅡ,those of main module:HR and check on work attendance and Account Module;Storage in and out module;Orders module;MPS module;Production module;Ship module;the Excellence module are the Production(cloth Barcode) and heck on work Attendance module by the IC card,Resolve the account of depart to calculate difficulty by the job salary,the software program And system are base On C/S structure; |
Reasons for leaving: | left |